Loading...
Opening Hours : Saturday - Thursday 08 AM to 05 PM
logistic

land transport from Al-Qudus power plant to South Baghdad power plant

7 PKGs // 1 SP 12 AXLE  & 2 LB

Heaviest package 177 tons Generator



Read More Projects


BHDC Rig 51

BHDC Rig 51

OC conversion upper part Rumaila power plant 95 tons

OC conversion upper part Rumaila power p...

Three Phase Separators Shat Al Basra Power Plant 146 tons

Three Phase Separators Shat Al Basra Pow...

Customs clearance and transportation

EnglishCustoms clearance and transportat...

Transport heavy cargo to the Anbar Power Station

Transport heavy cargo from under hook -...

GT upper part Rumaila Power Plant 137 tons

GT upper part Rumaila Power Plant 137 to...

Steel Bars from Iran

Steel Bars from Iran

BHDC Rig 37

BHDC Rig 37

GRT Pipes to Buzurgan 57 Cont on one BL

GRT Pipes to Buzurgan 57 Cont on one BL