Loading...
Opening Hours : Saturday - Thursday 08 AM to 05 PM
logistic

Heavy lifts to Rumaila Power Plant Project 86 tons Width 8.80 meters

Heavy lifts to Rumaila Power Plant Project 86 tons Width 8.80 meters



Read More Projects


GT upper part Rumaila Power Plant 137 tons

GT upper part Rumaila Power Plant 137 to...

BHDC Rig 51

BHDC Rig 51

Al-Anbar Power Station

We have recently achieved a successful c...

Three Phase Separators Shat Al Basra Power Plant 146 tons

Three Phase Separators Shat Al Basra Pow...

GRT Pipes to Buzurgan 57 Cont on one BL

GRT Pipes to Buzurgan 57 Cont on one BL

GT Generator to Rumaila Power Plant 350 tons

GT Generator to Rumaila Power Plant 350...

Antonoil Rig

COSL Rig