Loading...
Opening Hours : Saturday - Thursday 08 AM to 05 PM
logistic

land transport from Al-Qudus power plant to South Baghdad power plant

7 PKGs // 1 SP 12 AXLE  & 2 LB

Heaviest package 177 tons Generator



Read More Projects


BHDC Rig 51

BHDC Rig 51

OC conversion upper part Rumaila power plant 95 tons

OC conversion upper part Rumaila power p...

BHDC Rig 37

BHDC Rig 37

Three Phase Separators Shat Al Basra Power Plant 146 tons

Three Phase Separators Shat Al Basra Pow...

Al-Anbar Power Station

We have recently achieved a successful c...

Transport heavy cargo to the Anbar Power Station

Transport heavy cargo from under hook -...